Project |
Synovate |
Client |
Workspace |
Business |
Global Market Research |
Architect |
3WM |
Brief |
To take the initial design sketches and develop them
into full working drawings for approval by the design
team, then manufacture and install the bespoke items
in accordance with the approved drawings.
|
Scope |
Reception Desk, Copy / T point areas, Viewing Room
Boardroom furniture, Staff refreshment area, Staff relaxation booth.
|
Timescale |
12 weeks from appointment until project completion |
Materials |
Magnetic Glass (developed by West One Uk)
LG Hi-Macs, Laminates, Toughend back painted
Glass, Barrisol stretch ceiling, Polyester lacquer
|
Challenges |
To develop the self supporting shaped reception desk
(circa 2 tonnes) with the aid of design technology from the aircraft Industry and thermo forming technology to shape
the LG Hi Macs material in 12 weeks from concept to handover
|
Value Added |
Full design and technical calculations provided by West
One, keeping all of the challenges in house and
manageable. Detailed weekly reporting by West One
ensured that communication channels were kept open
resulting in an on time delivery within budget.
|